Data CO2-neutral energy system Duisburg Gateway Terminal
Electricity demand: 3,500 MWh/a (for 6 crane systems in the final stage (currently 3), 4 shore power terminals, car charging stations, buildings, lighting, small consumers)
Heat requirement: 77 MWh/a
PV system:
Output: 1.3 MWp
Electricity generation: 1,123 MWh/a
Area: approx. 10,000 m2
1 mtu EnergyPack battery storage:
Electrical output: 1.5 MW
Capacity: 1.6 MWh
2 H2 CHP units based on 2 x 12V4000 mtu engines:
Electrical output: 2 x 931 kW
Power Output: 2 x 748 kW
2 H2 mtu fuel cell systems:
Type: PEM fuel cells
Electrical power: 2 x 600 kW
Imagery is available for download from: Media Center (mtu-solutions.com)
Further information can be found in our website story
See also the video on the new CO2-neutral energy system in the Port of Duisburg